PBC was engaged under a full Design and Construct contract to deliver this project during a highly volatile market period. Following extensive early planning and negotiation, multiple design and construction options were assessed to balance cost certainty with the client’s operational requirements.

With programme certainty identified as the key driver, PBC adopted a predominantly concrete tilt-panel solution to reduce lead times, manage labour availability, and control risk. This approach enabled the project to be delivered within budget and timeframe, ensuring the client’s new facility was operational prior to the expiry of their existing lease.